MAKISHINKO ALL PRODUCTS GUIDE
277/390

JACKE-70At shipmentMotorInputOutputSimultaneous turn-offSeparate turn-offDC turn-off (rapid turn-off)0.2-0.55 second0.1-0.3 second0.01-0.04 second0.2-0.55 second0.1-0.3 second0.01-0.04 second0.1-0.3 second0.01-0.04 secondSingle phaseThree phaseInverter driveWiring point Wiring pointWiring pointCircuitPower- supplyPower- supplyPower- supplyPower- supplyPower- supplyPower- supplyPower- supplyPower- supplyPower- supplyPower- supplyPower- supplyPower- supplyInverterInverterInverterInverterUpperLowerUpperLowerUpperLowerPower- supplyPower- supplyPower- supplyPower- supplyCircuitCoasting timeCoasting timeCoasting timeCircuitMotor Brake Motor Brake Motor Brake Motor Brake Motor Brake Motor Brake Motor Brake Motor Brake Motor Brake Motor Brake Motor Brake (Upper) Fasten-connecterFasten-connecterFasten-connecterFasten-connecterFasten-connecterFasten-connecterFasten-connecterFasten-connecterFasten-connecterFasten-connecterInside-wiringFor.1-0.4kwOnly for.1-0.4kwInside-wiringInside-wiringFasten-connecter(Upper) (Upper) (Upper) (Upper) (Upper) (Upper) (Upper) Terminal box platform Terminal box platform Terminal box platform Terminal box platform Terminal box platform Terminal box platform Terminal box platform Terminal box platform Braking coasting time of brake for geared motor with brake unit is different from brake wiring method (timeof brake start after switch off).Please wire with best method in accordance with application.●Please pay attention that three phase 0.1-0.4KW motor with brake unit is connected by simultaneous turn-off when leave factory.Note:1. Stark mark indicates connection lead line. Please must connect it to U-B2 (upper). But must remove it for in case of separate turn-off. 2. In case of separate turn off and DC turn off (rapid turn-off), fasten-connector on the terminal platform should be removed in accordance with wiring method of above chart. 3. Terminal platform of 0.1-3.7KW is divided into two sections. Wiring of motor and brake power supply must be connected with upper terminal screw. Brake dose not release if connected with lower section. 4. Above example is for wiring of Mitsubishi motor.Brake wiring point and brake coasting time

元のページ 

10秒後に元のページに移動します

※このページを正しく表示するにはFlashPlayer9以上が必要です